Vimy Memorial Bridge

Location

Ottawa. ON

Completion

Fall 2014

ART Engineering Inc. was retained by Concreate USL Ltd. and later Horseshoe Hill Construction Inc. to provide structural consulting services for the constrcution of the Vimy Memorial Bridge. The bridge has recently been awarded with the prestigious Gustav Lindenthal Medal at the International Bridge Conference, recognizing its aesthetic qualities and harmony with it's surrounding environment. Constructed adjacent to the bridge location, the structure was transported across a temporary bridge for it's final installation. As such, various temporary structure designs and services were required.

Bridge jacking procedures.

Suspended temporary access platform deisgns.

Erosion and sediment monitoring analyses.

Temporary deck construction platform design.

Deck and abutment formwork design.

Structural steel shop drawing review.

Construction consultations and feasibility assessments.

Companies Involved

Horseshoe Hill Construction Inc.

Access Rigging Services Inc.

Concreate USL Ltd.

Thumbnail image for project 13

Canadian High Arctic Research Station


August 31, 2021

Thumbnail image for project 15

ART Engineering Inc. Research and Development Centre


August 31, 2021

Art Engineering logo
Locations

Ottawa (Head Office)

171 Walgreen Road

Carp, Ontario

K0A 1L0

Milton (GTA Office)

203 – 310 Main Street East

Milton, Ontario

L9T 1P4

Kingston

2-695 Innovation Drive

Kingston, Ontario

K7K 7E6

North Bay

115-1350 Fisher Street

North Bay, Ontario

P1B 2H1

© Art Engineering Inc. 2019. All Rights Reserved.